Skip to content

The walls here are not what most electricians expect

EV Charger Installation in Norlane

Norlane is Victorian Housing Commission housing built between 1947 and 1976 with the peak from 1951 to 1957, some 2,464 houses in total. More than 1,200 of them were prefabricated units shipped in from Holland and France, and they do not behave like standard brick veneer when you open a wall.

  • Norlane 3214
  • Powercor network
  • REC 37223

The short answer

EV charger installation in Norlane 3214 has one complication nowhere else in the region has. Of the 2,464 Housing Commission houses built here between 1947 and 1976, more than 1,200 were prefabricated units imported from Holland and France, and their wall construction is not what an electrician expects from conventional Australian brick veneer, so cable routes have to be confirmed rather than assumed. Powercor is the distributor. Expect $800 to $3,500 for a board and $1,200 to $2,200 for the charger.

Tesla Wall Connector installed on timber cladding with the cable coiled on its hook

From one of our jobs

A Tesla Wall Connector on a dedicated 32A circuit

Photographed on site in Melbournes west. REC 37223.

Knowing that before quoting is the difference between a clean job and a surprise. The blocks themselves are excellent to work on, uniform with wide frontages and clear side access, so once the cable route is settled the rest of a Norlane charger job is straightforward.

The prefabricated houses and the cable route

More than 1,200 of the houses here are imported prefabricated units from Holland and France. The wall construction is not conventional Australian brick veneer, the cavity behaves differently, and the fixing substrate is not what a bracket is normally specified against. An electrician who has only worked standard stock will guess wrong.

So we confirm the route rather than assume it. That means opening a small inspection point at the quote stage where the wall type is not obvious, and choosing the mounting position around what the wall can actually take. It adds a little time at the front of the job and it removes almost all of the risk from the back of it.

  • Wall type confirmed first

    We identify whether it is a prefabricated unit before we commit to a cable route or a mounting position.

  • Fixings specified to substrate

    A bracket specified for brick veneer is not automatically right on these walls.

  • Route decided at the quote

    Not on the day with a drill in hand. That is how a straightforward job goes wrong here.

Wired for a Ford wage in 1953

These houses were built for Ford, International Harvester and phosphate works employees in the early 1950s, and the original installations were sized for a fraction of a modern household load. A charger drawing 32A continuously is a very different proposition to what the designer had in mind.

In practice that means the board and often the consumer mains both need looking at, not just the board. Replacement runs $800 to $3,500 depending on scope, and we quote it separately from the charger so you can see which part of the invoice is the car and which part is the house catching up.

  • Original sizing

    Sized for a 1950s household load. A 32A continuous charging circuit is well outside that assumption.

  • Mains as well as board

    A new board fed by original consumer mains still cannot carry the load. We check both.

  • Quoted separately

    $800 to $3,500 for the supply side, $1,200 to $2,200 for the charger install itself.

Asbestos and how a board comes off

Housing of this vintage frequently has asbestos in sheeting and meter box backing, which changes how a board is removed. It has to be identified before anyone cuts or drills, and on the prefabricated units it is worth being especially careful because the construction is unfamiliar.

We look at the meter box and the intended penetrations at the site visit and tell you plainly whether a licensed removal step is required. That keeps the timeline honest. It also means the quote you get is the quote you pay rather than an opening position.

  • Meter box backing

    Frequently asbestos sheet on this vintage. It changes the method and sometimes the timeline.

  • Identified at the quote

    Not discovered with the board already off, which is how a one day job becomes a three week one.

  • Unfamiliar construction

    On the prefabricated units we are more cautious about penetrations because the build-up is not standard.

Uniform blocks make the rest of it easy

The Commission blocks here are uniform with wide frontages and clear side access, laid out for standardised house types rather than individual designs. Once the wall type and the board are settled, getting cable to a carport or a rear garage is about as simple as it gets in this region.

One practical benefit of standardised estates is that the streets repeat. When we have done a charger on one house type in Norlane we know what the next one of that type looks like, which is why we book work here in blocks and why that scheduling genuinely helps the price.

  • Clear side access

    External conduit runs are the default here, which is the cheapest way to reach a rear parking position.

  • Standardised house types

    The streets repeat, so the second job on a given type is faster than the first.

  • Booked in blocks

    We schedule Norlane work together, which is how the travel from Altona stays off a single invoice.

Single phase, running costs and the paperwork

Norlane streets are single phase on the Powercor network, so 32A and about 7.4kW is the ceiling, adding 40 to 50km of range per hour. That is not a limitation for a car that sits at home overnight, and a phase conversion here would be money far better spent on the board.

Where a charger pays for itself in this suburb is the running cost. Charging at home overnight on an off peak tariff is a fraction of the price of public charging, and for a household making the drive to Melbourne several days a week that difference is substantial rather than marginal.

  • 32A single phase

    About 7.4kW, or 40 to 50km of range per hour, which fills any car overnight.

  • Off peak scheduling

    Set at commissioning so the cheapest window is used without anyone managing it.

  • Certificate of Electrical Safety

    Issued under REC 37223 with the commissioning current recorded, plus a 100% workmanship guarantee.

On the ground

Norlane specifics

  • More than 1,200 of the houses here are imported prefabricated units from Holland and France. Their wall construction is not what an electrician expects from conventional brick veneer, so cable routes and fixings are confirmed rather than assumed.
  • The estate was built between 1947 and 1976 for Ford, International Harvester and phosphate works employees, so original installations were sized for a fraction of a modern household load. Consumer mains often need checking alongside the board.
  • Housing of this vintage frequently has asbestos in sheeting and meter box backing, which changes how a board is removed. We identify it at the site visit rather than mid-job.
  • Uniform Commission blocks with wide frontages and clear side access make the cable run genuinely easy here, and the standardised house types mean the second job on a given type is faster than the first.
PDF

Free download

The Melbourne Home EV Charger Buyer's Guide

What a charger actually costs, how to tell whether you need three phase, and the six questions that separate a real quote from a cheap one. Four pages, no email required.

PDF · 4 pages · 2026 edition

Download the guide
REC 37223SAA S3962281ABN 876892969375.0 from 63 Google reviews100% workmanship guarantee

Licensed and accredited work by a local team. Read about Pivot Trade Services or see recent jobs across the western suburbs.

Answers

Norlane questions

Their wall construction is not conventional Australian brick veneer, because more than 1,200 of them were shipped in from Holland and France in the 1950s. The cavity behaves differently and the fixing substrate is not what a bracket is normally specified against. We confirm the wall type before committing to a cable route or a mounting position.

Get a Norlane quote

Tell us the address and what you need. We quote Norlane 3214 and the surrounding western suburbs in writing, with no obligation.

Free
On-site quotes
Fixed
Written pricing
100%
Workmanship guarantee
5.0★
63 Google reviews